Target Store at Tradition, Village Parkway
This project consisted of the new construction of a new 135,000 sf retail building. The building was constructed with tilt walls and steel frame roof. UES performed all inspections and testing for the building including reinforcing steel inspection, concrete monitoring and testing, weld and bolt inspection, floor flatness, moisture emissions, etc.